news
MEDIA

Plutonic Power Announces Peter Flynn Appointed to Board of Directors

07/25/2006


Vancouver, BC - July 25, 2006 - Plutonic Power Corporation (PCC - TSXV) is pleased to announce the appointment of Dr. Peter Flynn to its Board of Directors.

Dr. Flynn has over thirty years of experience in the Canadian energy and engineering industry. Dr. Flynn is currently a professor in the Faculty of Engineering and holds the Poole Chair in Management of Engineers at the University of Alberta. He is also a director of the Electricity Balancing Pool for the Province of Alberta and is a past and founding director of Edmonton Power, now known as EPCOR.

Dr. Flynn's career spans various energy and engineering related fields. He was the President of Corod Industries, an affiliate of GE Canada, a Vice President of Nova Corporation and Sherritt Inc. and is currently the director of several not-for-profit organizations. Dr. Flynn has a Bachelor of Science degree from the University of Delaware, a Masters in Engineering from Berkley and a PhD in Chemical Engineering from the University of Alberta.

In consideration of this appointment, the company wishes to announce the grant of 200,000 incentive common share purchase options, exercisable at $2.12 for a five year term.

Plutonic Power is an emerging energy producer in British Columbia. Its proposed 19 projects have a design capacity of over 870 MW and the potential to generate approximately 2900 GW.h per annum of green energy - enough energy to meet the annual energy needs of approximately 300,000 homes. Included in the 19 projects is the creation of the Green Power Corridor, a series of non-storage hydroelectric projects in southwestern BC, which hold the potential to catapult British Columbia to the forefront of green energy generation in North America. The completion of the Green Power Corridor would be through one of the largest single private sector green energy investments ever made in British Columbia and would create over 2,400 person-years of employment.

The Company has entered the East Toba and Montrose, Rainy River and Emory Creek projects into the 2006 BC Hydro Call for Tender (CFT). These three projects will have a combined capacity of 217.5 MW. Contracts are expected to be awarded by BC Hydro on Thursday, July 27.

Plutonic is committed to continuously work with First Nations, stakeholder groups and local communities in the development of its run of river projects.

On behalf of the Board of Directors,

PLUTONIC POWER CORPORATION

"signed"

Donald McInnes, President

For additional information please contact:

Lisa May
Investor Relations
Office: 604-669-4999 ext 1034
Cell: 604-314-3362
lisa.may@plutonic.ca

The TSX Venture Exchange does not accept responsibility for the adequacy or accuracy of this release.